中文/ENGLISH

Quality Control

Focus, Professional, Technology

Mould Design Equipment Quality Control
qc

Assure hign quality mold carefully,attentively and painstakingly.

For most of our molds we require 60 days for Molds manufacturing after which we conduct first trials before the molds go into analysis of the desired product, finishing, polishing, chrome plating and then for inspection. We conduct at least 3 trials before the molds are packed for shipment. Our Molds trials are conducted under supervision of experienced technical personnel who strive to avoid poor quality being passed on to the next stage of improvements. We also encourage our customers to visit the trials for their satisfaction.

Our molds are well painted, greased, Packed perfectly in the factory after which special care is taken for handling, storage and delivery to ensure customer satisfaction of their orders from first stage to final despatch.

Mould Process Flow

Sbonol mould Co.,ltd

ADD: No.3 HongQi Road,West mould industry zone, HuangYan, TaiZhou city, ZheJiang, China.

E-mail: info@sbonol.com     Fax: 0086-576-88208621

Tel:: 0086-576-85415509     Website: www.sbonol.com

© 2025 Sbonol mould Co.,ltd All rights reserved.

TOP